Ready Mixed Concrete Manufacturing License Dubai | My Business Setup

Ready Mixed Concrete Manufacturing License Dubai: Cost Guide

Content reviewed by My Business Setup Team, Business Setup Specialists.

A Ready Mixed Concrete Manufacturing License in Dubai or UAE is an industrial setup that should be planned around production, plant model, and operating approvals first. The main question is whether the business will run a dedicated production facility, supply projects directly, or combine manufacturing with broader contracting-linked operations. That affects site fit, authority route, and total launch cost. This type of setup is usually far more dependent on plant, premises, and approvals than a standard commercial company formation.

Category Industrial
Free zone cost AED 15,000 - 60,000
Mainland cost AED 25,000 - 55,000
Timeline 20-45 working days
Office Warehouse or industrial unit required
Visa quota Scales with unit size, typically 5+

Who Should Consider a Ready Mixed Concrete Manufacturing License Dubai?

  • Lean founders validating demand
  • SMEs expanding services or adding a new revenue line
  • Operators formalizing existing work under a UAE entity

What You Can and Cannot Do

Ready mixed concrete manufacturing scope should be checked against the actual production and supply model, especially where batching, transport, plant operation, storage, or project delivery are involved. Industrial and site-related approvals may extend beyond the trade license itself.

Jump to Documents or FAQs.

How Much Does a Ready Mixed Concrete Manufacturing License Dubai Cost?

For a Ready Mixed Concrete Manufacturing License Dubai, expect AED 15,000 - 60,000 in a free zone and AED 25,000 - 55,000 on the mainland for year one, with the licence issued in roughly 20-45 working days once documents are ready. The lower end of each range is a single-activity licence with no staff visas in a low-cost emirate; the upper end reflects Dubai, extra activities, or a larger office.

Indicative year-one cost for a Ready Mixed Concrete Manufacturing License Dubai — reviewed October 2026
ItemIndicative costNotes
Free-zone licence (year one) AED 15,000 - 60,000 Ajman, Fujairah, Sharjah, RAK and UAQ sit at the low end; Dubai zones at the high end
Mainland licence (year one) AED 25,000 - 55,000 Excludes the tenancy, which mainland requires separately
Establishment / immigration card AED 1,200 - 2,000 One-off, needed before any visa
Investor or partner visa (2 years) AED 3,500 - 5,500 Includes medical, Emirates ID and status change
Employee visa (2 years) AED 4,000 - 6,500 Per employee, plus deposit on mainland
Ejari tenancy (mainland only) from AED 15,000 / year Not required for a free-zone flexi desk
Corporate tax registration No fee 9% applies only on taxable profit above AED 375,000
Annual licence renewal 85 - 100% of year-one licence fee Excludes one-off formation items

Indicative market ranges for planning, not a quote. Government fees, zone packages and external approvals change; confirm current figures before you apply.

Approvals you should budget time for

Municipality, Civil Defence and MoIAT industrial licence. This is the part that moves the timeline, not the licence itself.

Budget should reflect plant setup, industrial premises, approvals, staffing, transport model, and whether the business remains manufacturing-focused or works as part of a broader construction supply chain.

Good to know

  • 100% foreign ownership available
  • Flexi/shared office keeps overhead low
  • Visa quota scales with office size

Watch out

  • Choosing the wrong jurisdiction for your sales model
  • Under-budgeting immigration items (establishment card, visas)
  • Missing activity-specific technical approvals

How to Get Started

  1. Confirm batching capacity and mix designs
  2. Lease plant site and submit layout HSE and equipment list
  3. Provide environmental dust and wastewater controls
  4. Issue license and establishment card
  5. Maintain QA cube tests and delivery logs

Documents Checklist

  • Passport copy & recent photo of each shareholder
  • Current visa/entry status
  • 2 to 3 preferred trade names
  • Brief scope & staffing plan

Ready Mixed Concrete Manufacturing License Dubai FAQs

Is a physical office mandatory for Ready Mixed Concrete Manufacturing License Dubai?

Many Free Zones allow flexi/shared packages. Mainland may require Ejari depending on visas and the activity.

How many visas can I start with?

Commonly 1 to 4 at the start, subject to office allocation and immigration rules.

What is included in the base cost?

Trade license and core company docs. Immigration items (establishment card, status change, medical, Emirates ID) may be bundled or itemized.

Planning your UAE setup?

Free tools and guides to set up the right way:

Last updated: October 2026

Requirements, timelines, and fees vary by jurisdiction, office setup, and external approvals. Confirm the current structure before applying.